{"product_id":"phoenix-rail-system-stage","title":"Phoenix Rail System — Stage","description":"\u003cp\u003e\u003cem\u003eELVARNIXO Rigging — gravity, negotiated\u003c\/em\u003e\u003c\/p\u003e\u003cp\u003eA studio's ceiling is its best assistant; the Phoenix trains it — cables gone from the floor, lights travelling on rails like thoughts, and paperwork that studio insurance actually reads.\u003c\/p\u003e\u003cp\u003eGrip is applied scepticism about gravity. Our stands and rigs are steel and aircraft aluminium with stated load ratings tested at double, knuckles that bite without stripping, and legs that level on cobbles, cables and church steps. Nothing here is decorative: every casting is load-bearing and every weld is inspected.\u003c\/p\u003e\u003ch3\u003eDesign \u0026amp; Craft\u003c\/h3\u003e\u003cul\u003e\n\u003cli\u003eTwo years parts and labour; grip parts stocked fifteen\u003c\/li\u003e\n\u003cli\u003eLoad ratings stamped, tested at double before batches ship\u003c\/li\u003e\n\u003cli\u003eCarriages glide under load and lock without drama\u003c\/li\u003e\n\u003cli\u003eSteel and aircraft aluminium; every casting load-bearing\u003c\/li\u003e\n\u003cli\u003eKnuckles bite without stripping — serviceable, stocked\u003c\/li\u003e\n\u003cli\u003eSurvey, engineering and paperwork included in CZ\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch3\u003eSpecifications\u003c\/h3\u003e\u003ctable\u003e\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003eCoverage\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003eTo 120 m² stage\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003eRating\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003eEngineered margin, certified\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003eCarriages\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003eGlide under load, locking\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003eInstall\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003eSurvey + install + papers, CZ\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003eExpansion\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003eJunctions are catalogue parts\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003eWeight\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003e≈ 90.0 kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003eWarranty\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003e2 years + yearly inspection\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\u003c\/table\u003e\u003ch3\u003eCare\u003c\/h3\u003e\u003cp\u003eWipe risers dry after exteriors, keep knuckles free of grit, and a drop of dry lube on threads twice a year. Check load pins and safety cables before every overhead rig — thirty seconds that insurance adjusters never get to bill.\u003c\/p\u003e\u003ch3\u003eQuestions, Answered\u003c\/h3\u003e\u003cp\u003e\u003cstrong\u003eWhat are the real load ratings?\u003c\/strong\u003e\u003cbr\u003eStamped on the equipment and stated in the listing, tested at double before a batch ships. If you need more, rig bigger — never closer to the limit.\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eDo you install rail systems?\u003c\/strong\u003e\u003cbr\u003eYes — survey, engineering, installation and certification are included in CZ; EU-wide by quote. Ceilings differ; the paperwork always arrives.\u003c\/p\u003e\u003ch3\u003eThe ELVARNIXO Promise\u003c\/h3\u003e\u003cp\u003eOne standard across the range: if it would not survive our own rental fleet, it does not ship with the ELVARNIXO mark.\u003c\/p\u003e","brand":"ELVARNIXO","offers":[{"title":"Default Title","offer_id":60201725165902,"sku":"ELX-RASY-007-01","price":168500.0,"currency_code":"CZK","in_stock":true}],"url":"https:\/\/www.elvarnixo.com\/products\/phoenix-rail-system-stage","provider":"ELVARNIXO","version":"1.0","type":"link"}