Candela Rail System — Stage
Tax included where applicable. Delivery, rigging and commissioning arranged by your concierge.
ELVARNIXO Rigging — gravity, negotiated
A studio's ceiling is its best assistant; the Candela trains it — cables gone from the floor, lights travelling on rails like thoughts, and paperwork that studio insurance actually reads.
Overhead systems are engineered like the ceilings they hang from: rails rated with margin, carriages that glide under load, pantographs balanced so one hand moves what one hand should. We survey, install and certify — paperwork included, because studio insurance reads paperwork, not brochures.
Design & Craft
- Survey, engineering and paperwork included in CZ
- Two years parts and labour; grip parts stocked fifteen
- Expands later — junctions and drops are catalogue parts
- Knuckles bite without stripping — serviceable, stocked
- Load ratings stamped, tested at double before batches ship
- Steel and aircraft aluminium; every casting load-bearing
Specifications
| Coverage | To 120 m² stage |
| Rating | Engineered margin, certified |
| Carriages | Glide under load, locking |
| Install | Survey + install + papers, CZ |
| Expansion | Junctions are catalogue parts |
| Weight | ≈ 107 kg |
| Warranty | 2 years + yearly inspection |
Care
Sand stays in sandbags: brush leg joints after beach and site work. Do not exceed stamped loads, ever, even briefly. Rail systems get a yearly inspection by our riggers — included for the first two years.
Questions, Answered
Will stands survive location work?
Steel and aircraft aluminium, stainless fasteners, and legs that level on real terrain. Our rental fleet is the torture test.
Do you install rail systems?
Yes — survey, engineering, installation and certification are included in CZ; EU-wide by quote. Ceilings differ; the paperwork always arrives.
The ELVARNIXO Promise
Two years parts and labour, fifteen years of parts on the shelf, and a loaner fixture on your set while yours is on our bench.