Faro Rail System — Stage
Tax included where applicable. Delivery, rigging and commissioning arranged by your concierge.
ELVARNIXO Rigging — gravity, negotiated
A studio's ceiling is its best assistant; the Faro trains it — cables gone from the floor, lights travelling on rails like thoughts, and paperwork that studio insurance actually reads.
Overhead systems are engineered like the ceilings they hang from: rails rated with margin, carriages that glide under load, pantographs balanced so one hand moves what one hand should. We survey, install and certify — paperwork included, because studio insurance reads paperwork, not brochures.
Design & Craft
- Ceiling rails rated with margin, certified on install
- Carriages glide under load and lock without drama
- Knuckles bite without stripping — serviceable, stocked
- Load ratings stamped, tested at double before batches ship
- Survey, engineering and paperwork included in CZ
- Two years parts and labour; grip parts stocked fifteen
Specifications
| Coverage | To 120 m² stage |
| Rating | Engineered margin, certified |
| Carriages | Glide under load, locking |
| Install | Survey + install + papers, CZ |
| Expansion | Junctions are catalogue parts |
| Weight | ≈ 142 kg |
| Warranty | 2 years + yearly inspection |
Care
Wipe risers dry after exteriors, keep knuckles free of grit, and a drop of dry lube on threads twice a year. Check load pins and safety cables before every overhead rig — thirty seconds that insurance adjusters never get to bill.
Questions, Answered
What are the real load ratings?
Stamped on the equipment and stated in the listing, tested at double before a batch ships. If you need more, rig bigger — never closer to the limit.
Will stands survive location work?
Steel and aircraft aluminium, stainless fasteners, and legs that level on real terrain. Our rental fleet is the torture test.
The ELVARNIXO Promise
Trade up within five years at an honest, published buy-back rate. Working photographers' equipment should hold its value the way it holds its colour.